英语翻译因为我们现在只有A产品的库存,这产品通过抛光加工后变成B产品,此加工程序大概需要5-7天的时间.而其他产品,因为

2个回答

  • We only have A in storage now.This product can turn into B after polishing.The process needs 5-7 days.While referring to other products ,they also needs cutting process,which takes 12-15 days.The time interval between those two is only few days.To save L/C to hand in the order and relating cost.We advise you sent them to us at one time,rather than in batches.

    纯手打~