1, deferred to work out if done after a clean, tidy environment site work,
2, sooner or later, also is mainly work formally began preparations, conduct safety awareness, through awareness drop labor damage reduction.
1, the provisions in the production line extension class shall not exceed 30 minutes (more than time-averaged shall truthfully declare overtime);
2, regarding direct employees, the integrated curriculum elective courses, for interest skills upgrading by employees voluntary participation;
3, staff of the class reason not subdivided understanding, actual right ahead of the foreseeable switched with temporary switched is seperated processing.
1, in accordance with production line to arrange production schedule, all can adjust class above at least one day in advance notice,
2, special situation caused by compulsory seconded class, the responsible units responsible for absorbing hours, the employee does not have to class fills,
1, employees in halfway after the break, returns to his post more homework, to catch wire-speed, anxious to first test front several machines and then wear gloves,
2, machine signal loose, staff wear gloves inconvenient handling of the abnormal (heavy inserted signal lines), is the glove with heavy inserted signal lines; pluck
1, new employees of high-pressure grounding stance safety consciousness is insufficient still, lead to return hillock when does not perform first wear gloves and test again, it will be again on employees pertinence training;
2, aiming at midway after the break, again before production, the foreman ways by standing check whether the correct use of every employee in all work instructions fixtures, OK again after ways production.
3, education staff during the process of working appear such anomalies, shall not be disposed, they must inform foreman processing,
1, temporary an excrescent circumstance control is not comprehensive caused
1, foremen/supervisor in XunXian process in accordance with instructions for employees are correctly taking protective measures to supervision,
2, set up the production line has special production process audit team of employees in accordance with the instruction, whether assignment to audit and superintend the improvement;
3 all temporary anomaly are both inform foreman assist to handle,
Input the content has reached length limitation can input 999 word