Along with the progressing structural reformation of construction industry regulation,the construction management of engineering project drew more and more attention from individuals.The level of management becomes the initial factor that decides the survival and development of companies.Moverover,the quality,progression and control over costs are the key points of construction management.
This passage,by taking contruction project as the example and incorporating realities,designs every parts of the construction plans in detail.It uses the theroem of progression control as the base,starting from the manager's perspective,plans and designs the whole schedule for the system from the preperation of the project to the final acceptance of completed project.Gantt chart and network planning are also used to analysis the construction planning,and provides pragmatic measures to ensure the scheduled plan is followed according to the real situations.
As for the quality and safty,strict technology and organizational measures are formulated.Common problems that come up during the process of constuction are also schemed to be solved,besides,corresponding management organzation shall be established to ensure the realization of quality and safty concerns.
累死了!人工翻译!
来自英语牛人团——知道团队