汉译英 急 急 急 1.贷款协议生效一个月内2.桥梁钻孔桩完成20%一个月内3.桥梁钻孔灌注桩完成40%,道路全线路基土

1个回答

  • 1.Loan Agreement entered into force one month

    2.Bored piles to complete 20% of the month

    3.Completed 40% of bored piles,roads,earth embankment across the board within one month after the completion of 30%

    4.Bridge substructure works completed 40% of the amount of road earthwork embankment across the board within one month after the completion of payment 60%

    5.Bridge substructure works completed 70% of the amount of road surface across the board within one month after the completion of payment 30%

    6.Bridge Superstructure Quantities 60% completed,the road surface across the board within one month after the completion of payment 60%

    7.Bridge project completion payment amount

    8.Project is completed within one month after the transfer of payments

    9.1 K3 +822,K2 +277 Pipe Culvert I Slope gradient and thickness does not meet the design requirements of masonry

    9.2 K23 +610 K24 +010 Ditch bunk cover thickness does not meet design requirements

    9.3 K118 excavation section on the left gutter body made of mortar and stone wall construction,rubble geometry does not meet the requirements,mortar and mortar is not full of very poor quality

    9.4 The requirements do not meet the design requirements of the masonry rework

    9.5 calls for bunk thickness does not meet the design requirements for rework

    Paragraph 9.6 of the masonry required rework

    10.1 Supervision General lette