(1)甲、乙、丙合作2天,完成了2*(1/10+1/12+1/15)=1/4,还剩3/4;
(2)甲、乙合作3天,完成了3**(1/10+1/12)=11/20,还剩9/20;
(3)乙、丙合作4天,完成了4*(1/12+1/15)=3/5,2/5;
(4)甲、丙合作5天,完成了5*(1/10+1/15)=5/6,还剩1/6.
(1)甲、乙、丙合作2天,完成了2*(1/10+1/12+1/15)=1/4,还剩3/4;
(2)甲、乙合作3天,完成了3**(1/10+1/12)=11/20,还剩9/20;
(3)乙、丙合作4天,完成了4*(1/12+1/15)=3/5,2/5;
(4)甲、丙合作5天,完成了5*(1/10+1/15)=5/6,还剩1/6.