英语翻译武青四干道(铁机路~王青公路)道路排水工程子项:桥梁工程,本段道路沿线横跨沙湖港、东湖港和东湖新港,跨港共设桥梁

1个回答

  • Wu Qing four corridors (Rail-Road to Wang Qing Highway) of the road drainage project: Bridge, across the road along the Shahu, Hong Kong, Hong Kong and East Lake, East Lake Newport, cross-Hong Kong established a total of five bridges, should pay attention to the East Lake Overseas Chinese, the height restrictions on the road, bridge design to the water to meet the transportation function of the main East Lake Newport Bridge - a bridge at the station before the three open landscape with the end of East Lake in Newport connection, while the bridge is also a former Road Station Wu Qing four corridors and T-crossing, width 65.7 m, in addition to the design of this bridge to meet the water transportation requirements, to meet landscape requirements. This works for the construction of five bridges at the same time, work is very difficult, long construction period. Ming Wa expanded form the basis for the foundation (abutment) and bored pile foundation (Piers), the number of small water pier. The works taken for in-situ box girder process, because at the port, so take a half-water cofferdam construction platform to ensure the progress of construction and security.