Wu Qing four corridors (Rail-Road to Wang Qing Highway) of the road drainage project: Bridge, across the road along the Shahu, Hong Kong, Hong Kong and East Lake, East Lake Newport, cross-Hong Kong established a total of five bridges, should pay attention to the East Lake Overseas Chinese, the height restrictions on the road, bridge design to the water to meet the transportation function of the main East Lake Newport Bridge - a bridge at the station before the three open landscape with the end of East Lake in Newport connection, while the bridge is also a former Road Station Wu Qing four corridors and T-crossing, width 65.7 m, in addition to the design of this bridge to meet the water transportation requirements, to meet landscape requirements. This works for the construction of five bridges at the same time, work is very difficult, long construction period. Ming Wa expanded form the basis for the foundation (abutment) and bored pile foundation (Piers), the number of small water pier. The works taken for in-situ box girder process, because at the port, so take a half-water cofferdam construction platform to ensure the progress of construction and security.
英语翻译武青四干道(铁机路~王青公路)道路排水工程子项:桥梁工程,本段道路沿线横跨沙湖港、东湖港和东湖新港,跨港共设桥梁
1个回答
相关问题
-
道路桥梁工程技术(试验检测)什么意思
-
英语翻译集装箱箱单上的英语单词1.中转港:DEHAM 卸货港:HAMBURG2.中转港:EGSOK 卸货港:SOKHNA
-
港式英语 翻译
-
问大家几道初二科学题..`1.深港人民盼望已久的深港西部通道----深圳湾公路大桥正是贯通,(1)支撑桥梁的桥墩是否受到
-
道路与桥梁工程测量中常用的仪器有哪些!
-
主港和偏港分别是什么意思
-
英语翻译要道路方向 不要桥梁工程的 3000—4000字左右中文译文
-
10.轮船从甲港到乙港,速度是30千米/小时,按原路返回,从乙港到甲港,速度是20千米/小时.
-
一艘快艇从甲港经乙港开往丙港,每小时行38千米;同时一艘轮船从乙港开往丙港,4小时候两船同时到达丙港.设乙为x千米/小时