(1)v=5.4km/h=1.5m/s,P=120kW=1.2×105W,
由P=fV得:f=P/v=1.2×105W/1.5m/s=80000N
(2)推土机做的总功W总=Pt=1.2×105W×10s=1.2×106J
推土机做的有用功W有=Gh=6×104N×5m=3×105J,
所以效率η= W有/W总=25%
(1)v=5.4km/h=1.5m/s,P=120kW=1.2×105W,
由P=fV得:f=P/v=1.2×105W/1.5m/s=80000N
(2)推土机做的总功W总=Pt=1.2×105W×10s=1.2×106J
推土机做的有用功W有=Gh=6×104N×5m=3×105J,
所以效率η= W有/W总=25%