英语翻译不仅拖延了工期而且给工程造成了不应有的损失和浪费,影响了工程的经济效益和社会效益.由此在事故发生前的施工中采取一

1个回答

  • Not only delay the construction and engineering caused not due to the loss and waste, the impact engineering economic and social benefits. Thus the construction before the accident prevention measures must be taken to reduce accidents is very important. Therefore, it is necessary for specific engineering, geological conditions, discusses the deep foundation pit cast-in-place pile construction process and quality control method, in order to ensure the engineering quality.